当前位置:新闻动态
5 Steps to Optimize Feeder Connection Scheduling
来源: 编辑:编辑部 发布:2026/09/21 09:09:52
Calculate Minimum Connecting Time (MCT): Ensure your booking allows a 24 to 48-hour transfer buffer between the feeder vessel's Estimated Time of Arrival (ETA) in Singapore and the mother vessel's Port Cut-Off date.
Select the Right Terminal Berth in Laem Chabang: Coordinate cargo gate-in based on whether your feeder vessel calls at Kerry Siam Seaport, Hutchison Ports Thailand (Terminals B5/C1/C2), or Laem Chabang International Terminal (LCIT).
Align Booking Schedules with Factory Output: Coordinate Port Cut-Off times with export factory production runs in Chonburi, Rayong, or Ayutthaya to avoid origin demurrage or missed feeder cut-offs.
Monitor Real-Time AIS Tracking: Utilize satellite Automatic Identification System (AIS) tools and ocean carrier status APIs to track feeder vessel speeds in the Gulf of Thailand and anticipate berth delays.
Pre-File Customs and Export Declarations: Ensure Thai Customs e-Customs export declarations and Verified Gross Mass (VGM) filings are completed well before terminal gate-in to clear containers for immediate loading.
Select the Right Terminal Berth in Laem Chabang: Coordinate cargo gate-in based on whether your feeder vessel calls at Kerry Siam Seaport, Hutchison Ports Thailand (Terminals B5/C1/C2), or Laem Chabang International Terminal (LCIT).
Align Booking Schedules with Factory Output: Coordinate Port Cut-Off times with export factory production runs in Chonburi, Rayong, or Ayutthaya to avoid origin demurrage or missed feeder cut-offs.
Monitor Real-Time AIS Tracking: Utilize satellite Automatic Identification System (AIS) tools and ocean carrier status APIs to track feeder vessel speeds in the Gulf of Thailand and anticipate berth delays.
Pre-File Customs and Export Declarations: Ensure Thai Customs e-Customs export declarations and Verified Gross Mass (VGM) filings are completed well before terminal gate-in to clear containers for immediate loading.